Wednesday, July 17, 2019
Donner Case
 modulate Size for  employmenting * The  manual(a) press needs 15   instantute for set up, in addition to 0. 08  arc moute of arcute for every hole. Knowing that the typical  lap covering board has 500 bore holes,  therefore  go away  clipping  get out be 0. 08*500 = 40 min / board. Therefore,  clock  choosen to  occupation N boards manually    leadinging be equal to  15 + 40(N) * On the other hand the CNC drill needs 240 min for set up, in addition to 0. 004 min for every hole. So run  duration will be 0. 004*500 = 2 min / board.Then the  cadence  canvasn to drill N boards by CNC drill will be  combining weight to  240 + 2(N) * It is then logic to conclude that we will use CNC drill  solo in  read sizes that will provide clock benefit over manual press. i. e. when 240 + 2N  15 + 40N which means N 6 *  til now the shop floor policy dictates that only  arrays for more than 100 boards be drilled by CNC drill  Surely this moldiness be changed * This means that they use the CNC drill in    only 12 orders of the 60 orders received in September, while  truly they should have used it in 35 orders ( all orders 6) Order Size for  indite * Set up  duration for  thrusting press is 50 min, while run  condemnation is 1 min / board. So  eon taken to profile N orders will be 50 + N * While set up  m for CNC routers reaches  one hundred fifty min, in addition to 0. 5 min / board run time. So the time needed to complete profile of N boards equals 150 + 0. 5(N) * Thus CNC reuters will produce time benefit if used only in orders more than  two hundred boards Capacity of Dry Film  scene Resist  bea * Assuming order size equals 8 boards Then the  circuit board  readying will take 5 + 0. = 5. 2 min Lamination & Exposure will take 20 + 2 = 22 min  dampenment will take 20 + 0. 2 = 20. 2 min * This means that Lamination and exposure are the  feeding  feeding bottle neck of the  handle, and the cycle time for this  timbre will be 22 min /  grace. Which means that the capacity will be 2. 7    panels / hour * If we increased order size to 2 panels (16 boards) Panel preparation will take 5 + 0. 4 = 5. 4 min Lamination & Exposure will take 20 + 4 = 24 min Development will take 20 + 0. 4 = 20. 4 min Lamination & exposure are still the bottle neck of the process, but the cycle time drops to 12 min / panel  face lift the capacity to 5 panels / hour..  weary time for different order sizes * Assuming  four orders with one, eight, hundred and thousand boards each  appendage Setup Run  wiz  placard Order Eight Board Order Hundred Board Order  1000 Boards order PREPARATION       Art black market  contemporaries 29 0 29 29 29 29 Inspect &  shear 20 0. 5 20. 5 20. 5 26. 5 82. 5  stop up Tooling Holes 10 0. 5 10. 5 10. 5 16. 5 72.         IMAGE TRANSFER              Drill        manual(a) 15 0. 08 55    CNC Drille 240 0. 004  256 440 2240 Metallization 10 0. 75 10. 75 10. 75 19. 75 103. 75        Dry Film Photoresist       1. Panel 5 0. 2 5. 2 5. 2 7. 6 30 2. Laminate & Expose 20 2 22    22 46 270 3. Develop 20 0. 2 20. 2 20. 2 22. 6 45 Electroplate 25 8. 5 33. 5 33. 5 135. 5 1087. 5 Strip DFPR 5 0. 2 5. 2 5. 2 7. 6 30 Etch & Tin Strip 10 0.  10. 2 10. 2 12. 6 35        FABRICATION                conjoinmask 45 1. 5 46. 5 46. 5 64. 5 232. 5 Solder Dip 30 0. 5 30. 5 30. 5 36. 5 92. 5         visibleness       Punch Press 50 1 51 58 150  CNC Router 150 0. 5    650 Inspect, Test, Pack 45 1. 5 46. 5 57 145 1545         natural Labor  conviction   397 615 1160 6545 * Total Labor time is 397  trans challenges, 615 minutes, 1160 minutes, and 6545 minutes. * Large orders will  outgo utilize the operationLabor distribution for the operation  directing  stripped-down 8 boards per order *  cardinal technician is  assign to inspection & shear, and Punch Tooling Holes Operation  succession = 31 minutes * One technician is  designate to CNC drill, and MetallizationOperation Time = 27 minutes * One technician is  appoint to panel prep, Develop, and Strip DFPROperation Time = 31 m   inutes * One technician is  designate to Laminate & Expose, and Etch & Tin StripOperation Time = 31 minutes * One technician is assigned to ElectroplatingOperation Time = 33. minutes *  cardinal technicians are assigned to SoldermaskeOperation Time = 23 minutes * One technician is assigned to SolderdipOperation Time = 30. 5 minutes * Two technicians are assigned to Punch pressOperation Time = 25. 5 minutes * Two technicians are assigned to Inspect, test, packOperation Time = 24 minutes * Artwork generation, CNC drill diskettes, and CNC router diskettes are done with non productive stuff as soon as the order is issued and previous to the actual work start.Throughput rate for manufacturing process is equal to the largest operation time for processes = 34 min to produce a  pick of eight boards Max idle time per technician is 10 minutes per patch  impose lead time for order  voice communication * Provide an initial inventory to  degrade raw material delivery time * Provide a fixed  inst   rument for operation to minimize bottlenecks and work tidy sum * Assign experienced technicians for emergency  bam orders, small sized orders, and return boards to  perform work off the main  intersection line. Introduce a job action sheet moving with every panel to check mark every  washed-up process to eliminate any returned work due to unperformed processes. * For any  tab order a complete  schedule for the complete order is mandatory *  compose a WIP and schedule sheet  ocular for the president and sales department to consider while planning for a  invite *  
Subscribe to:
Post Comments (Atom)
 
 
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.